Best SAP E_S4HCON2023 Exam Practice Material Updated on Dec 01, 2025 [Q38-Q62]

Share

Best SAP E_S4HCON2023 Exam Practice Material Updated on Dec 01, 2025

New E_S4HCON2023 Actual Exam Dumps,  SAP Practice Test

NEW QUESTION # 38
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. During SPDD
  • C. Post-downtime
  • D. During uptime

Answer: C,D


NEW QUESTION # 39
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

  • A. Early in the downtime
  • B. Before the downtime starts
  • C. As part of the cleanup process
  • D. At the end

Answer: D


NEW QUESTION # 40
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?

  • A. Check the compatibility of custom code with SAP S/4HANA.
  • B. Run the database migration to the SAP HANA database.
  • C. Perform the migration of data to the new data structure.
  • D. Solve problems from the simplification item (SI) checks.

Answer: A


NEW QUESTION # 41
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Use DMO for SUM
  • B. Perform an SAP S/4 HANA conversion without DMO
  • C. Apply SAP support packages
  • D. Perform an SAP S/4 HANA conversion including DMO
  • E. Upgrade the SAP system

Answer: A,C,E


NEW QUESTION # 42
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Generate it by analyzing the specific custom code via RFC
  • B. Download it from SAP Support Portal
  • C. Apply the corresponding SAP note via SAP Note Assistant
  • D. Configure it within transaction ATC

Answer: B


NEW QUESTION # 43
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Answer: C


NEW QUESTION # 44
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To skip selected phases during the SUM run
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To repeat specific phases during the SUM run
  • D. To make the progress information within SUM UI more accurate

Answer: D


NEW QUESTION # 45
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. The link to different patch levels to SUM
  • C. The corrections to the SUM Guide
  • D. An overview about possible upgrade paths

Answer: B,C,D


NEW QUESTION # 46
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests in DIR_TRANS, subdirectory "transport"

Answer: C


NEW QUESTION # 47
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Conversion of application tables (PARCONVJJPG)
  • C. Switch to new repository (EU_SWITCH)
  • D. Modification adjustment (SPDD)

Answer: A,D


NEW QUESTION # 48
During a SUM run, you want to check if the PARCONV_UPG phase is still running properly. Where can you find information about this? Note: There are 2 correct answers to this question.

  • A. Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
  • B. Check the running batch job via Job Overview (SM37).
  • C. Check for running R3trans processes on the host where SUM is running.
  • D. Check for running R3load processes on the host where SUM is running.

Answer: A,B


NEW QUESTION # 49
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The upgrade of the PRD must be finished before you start new development in the DEV.
  • D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

Answer: B


NEW QUESTION # 50
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using work processes and network socket connection
  • B. Using R3load and memory pipes
  • C. Using R3load and network socket connection
  • D. Using R3load and file transfer

Answer: B


NEW QUESTION # 51
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • B. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • C. SAP S/4HANA conversion including database migration and Unicode conversion
  • D. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • E. Unicode conversion SAP S/4HANA conversion including database migration

Answer: B,D,E


NEW QUESTION # 52
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to run the migration without a shadow system
  • B. The repetition option allows you to repeat the complete migration
  • C. The benchmaking option allows you to migration a specified set of tables
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: C


NEW QUESTION # 53
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • B. Check for running R31oad processes on the host of the primary application server
  • C. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • D. Check for running R3trans processes on the host of the primary application server

Answer: A,D


NEW QUESTION # 54
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. DMO without system update
  • C. SAP S/4HANA conversion including DMO
  • D. Benchmark tool
  • E. SAP S/4HANA conversion without DMO

Answer: A,C,E


NEW QUESTION # 55
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Downtime migration
  • B. Downtime conversion
  • C. Shadow on target creation
  • D. Silent data migration (SDM)

Answer: A


NEW QUESTION # 56
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
  • B. SUM is still running in uptime; the 40 defined Reload processes are considered.
  • C. Without table contents comparison, only 40 R3load processes are being started.
  • D. These are 40 pairs of Reload processes, so there are 80 R3load processes running.

Answer: C


NEW QUESTION # 57
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Conversion of application tables (PARCONV_UPG)
  • C. Modification adjustment (SPAU)
  • D. Modification adjustment (SPDD)

Answer: A,D


NEW QUESTION # 58
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages of the support package stack, calculated by the maintenance planner
  • B. The SAP support packages in the download directory that are newer than the selected support package stack
  • C. The SAP support packages that will be bound to the conversion
  • D. The SAP support packages contained in the upgrade media, calculated by the maintenance planner

Answer: B


NEW QUESTION # 59
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • C. Choose the instance number of the shadow instance.
  • D. Reuse a profile for the shadow instance from a previous run.

Answer: C,D


NEW QUESTION # 60
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison on selected tables using check sum.
  • B. It performs a comparison of all tables using check sum.
  • C. It does NOT perform any table comparison.
  • D. It performs a comparison on all tables using row counts.

Answer: D


NEW QUESTION # 61
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In Process Control Center
  • D. In SUM Phaselist

Answer: B,C


NEW QUESTION # 62
......


SAP E_S4HCON2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the factors influencing downtime and techniques to reduce downtime: In this topic, SAP Consultants explore factors influencing downtime, such as system complexity and data volume. They learn techniques for optimizing performance and leveraging migration tools to reduce downtime during upgrades.
Topic 2
  • Perform the SUM prepare part: In the SUM prepare part, aspiring SAP consultants verify system prerequisites and execute the SAP Readiness Check. They also learn to prepare custom code for adaptation, reducing risks in the conversion process.
Topic 3
  • Perform the SUM prepare part: During the SUM execution, SAP consultants utilize the Software Update Manager for database migration options (DMO) and software updates. They learn to monitor processes closely to maintain data integrity and address errors promptly.
Topic 4
  • Monitor and troubleshoot the SUM procedure: SAP Consultants gain skills in monitoring logs and error messages during the SUM procedure. This proactive approach helps them identify issues early, minimizing downtime during upgrades.
Topic 5
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion and SAP system upgrade: Managing the SAP system landscape involves strategic planning for compatibility with SAP S
  • 4HANA. Consultants learn to assess dependencies among systems to facilitate a seamless transition with minimal disruption.
Topic 6
  • Perform the modification adjustment with SPDD and SPAU: The modification adjustment process teaches SAP consultants how to adapt modified objects using SPDD and SPAU effectively. They learn to ensure that custom developments remain compatible with SAP S
  • 4HANA functionalities.
Topic 7
  • Describe the necessary manual preparation and follow-on activities for SUM: Manual preparation for SUM involves performing readiness checks and adjusting custom code to ensure system compatibility. SAP Consultants gain skills in validating data migrations to mitigate risks during the upgrade.

 

Study HIGH Quality E_S4HCON2023 Free Study Guides and Exams Tutorials: https://examtorrent.testkingpdf.com/E_S4HCON2023-testking-pdf-torrent.html